Tuesday, December 28, 2010

Latest Project - Kitchen Remodel - Charlotte, NC

Breakfast bar removed. New counter to overhang 10"-12" with slight arc.

Relocation of floor vent. Quartz counter templating started.


Quartz counter top template for breakast bar area.

Tile installation completed.
Preliminary tile layout.



 
Breakfast Bar - Before.

Floor demo completed - Preliminary layout started.

Tile Layout.


Breakfast Bar - Before. Need to relocate switch and outlet.

18X18 Mesa Tile


New employee "Bennett" assists with floor demo.


Vinyl floor removal.

Vinyl floor removal completed.








1/4" backer board.


Tile installation begins.




Tile installation.

Tile Installation.


Tile is nearly completed.


Eat-in breakfast area.







Tile grout installation.

Grouting the tile.
RCI has started a small kitchen remodel this past week which includes removing the sheet vinyl flooring and installing 18"X18" porcelain tile, Removing the 12" raised breakfast bar and installing new quartz counter tops. RCI also had to relocate several electrical outlets and switches during removal and lowering of the breakfast bar.