Tuesday, December 28, 2010

Latest Project - Kitchen Remodel - Charlotte, NC

Breakfast bar removed. New counter to overhang 10"-12" with slight arc.

Relocation of floor vent. Quartz counter templating started.


Quartz counter top template for breakast bar area.

Tile installation completed.
Preliminary tile layout.



 
Breakfast Bar - Before.

Floor demo completed - Preliminary layout started.

Tile Layout.


Breakfast Bar - Before. Need to relocate switch and outlet.

18X18 Mesa Tile


New employee "Bennett" assists with floor demo.


Vinyl floor removal.

Vinyl floor removal completed.








1/4" backer board.


Tile installation begins.




Tile installation.

Tile Installation.


Tile is nearly completed.


Eat-in breakfast area.







Tile grout installation.

Grouting the tile.
RCI has started a small kitchen remodel this past week which includes removing the sheet vinyl flooring and installing 18"X18" porcelain tile, Removing the 12" raised breakfast bar and installing new quartz counter tops. RCI also had to relocate several electrical outlets and switches during removal and lowering of the breakfast bar.




Saturday, December 11, 2010

Custom Fabrication/Woodworking

Maple bookshelf with custom paint.


 
Inset drawer fronts.


Beaded frame.



Hardwood dovetail drawers with full extension drawer slides.

Friday, December 10, 2010

Custom Built TV Media Cabinet









A customer called and needed to build a TV cabinet to accomodate a larger TV unit. RCI designed, fabricated, finished and installed a custom built TV/Media cabinet to match the flanking bookshelves. The original TV cabinet held a 27" tube unit

Minor Bathroom Renovation



Ceramic Tile Installation
 

 Removed existing vinyl floor and installed ceramic tile. Removed wallpaper and repaired drywall.

Bath Remodel 100 Year Old Home

Original Master Bathroom

Demolition Starts

Demolition



Completely Refurbished Pedestal Tub

New Pedestal Tub Fixture

Vanity - Master Bathroom

Demolition



Brick Pattern Tile




New 1/2 Bath Vanity

New Toilet/Refinished Tub

Demolition Reveals Rotted Floor


Original Bath
 Existing master bathroom completed guttd to studs and framing. Linen closet removed and area converted into a new 1/2 bath accessible from the hallway. The existing pedestal tub was removed and completely refinished. Both the master bath and half bath received new tile floors, vanities, sink fixtures, mirrors, toilets and bath hardware.