Cornelius, NC - Old laminate flooring out - floor prepped for Bruce 3/4 T&G 3 1/4" oak flooring. |
1100 square foot installation - Red Oak |
Rosin paper installation. |
Picture framed fireplace hearth. |
Room completed. |
Room Completed |
Hearth Picture Frame. |
Transition Strip - These two rooms were done at different times requiring a "transition" piece at the door. |
Transition. |
Completed floor in family room. |
Bamboo floor installation - Mooresville, NC |
Removal and prep of "glue down" pickled oak in foyer area. |
Glue down installation process. |
Installation in front hallway. |
Bamboo completed in kitchen/dining area. |
More installation pictures. |
Bamboo completed in bedroom # 1. |
Bedroom # 1. |
Bamboo completed in master bedroom. |
Master Bedroom |
Installation - Master bedroom. |
Installation master bedroom. |