Kitchen Remodel
This project was completed in the fall of 2009. The existing kitchen was completely gutted, new kitchen cabinetry, granite counters, sink fixtures, and appliances were installed. The existing fluorescent lights were removed and recessed lights and pendant lighting was installed. The existing tile flooring was repaired to match up to the new cherry cabinetry. Several new electrical outlets and switches needed to be added to accommodate the new lighting and new oven. The popcorn ceiling was removed and the new smooth ceiling was repaired and repainted. The entire kitchen was repainted. The project was completed over a period of two weeks.